Work Finally begins on our new home!  PTL!!! -

Latest Pictures are on the bottom - click here

We had to stop construction for a while when the sale of our old home in Iowa fell through.  We had a long delay but finally work is starting up again after we finally sold the Iowa house after it was on the market for 2 years!!!

 

Getting ready to start.jpg (24840 bytes)

On August 8, 2003 - Construction begins on our new house.
In this picture, the 'layout' of the house is mapped on the ground.

Pouring House Footings.JPG (22880 bytes)

The footing is being poured - August 14, 2003.

 

After Jim installed the plumbing, stress cable installation began on September 8, 2003.

Pouring the Concrete Floor.JPG (27166 bytes)

 

firstwallgoesup.JPG (21143 bytes)

9/1/04 The first wall of our new home goes up.

wallsup.JPG (20888 bytes)

The walls are almost all up and ceiling joists in the north and west half of the house have been installed.

 

 

RaftersGoingUp.JPG (39113 bytes)

RoofCompleted.JPG (35021 bytes)

As information, we now have over 7,500' of wiring in the house - that nearly 1 1/2 miles of wiring.  Wow I never dreamed a house had that much wiring in it.  Of course that includes all 110v, 220v, Television, Telephone, Security Wiring, Door Bells, etc.

 

 

 

Finally Finished.  We moved in May 13, 2005