Initial Site Prep

Click here To Return to our Main Page

Home  

Clearing the Brush away.JPG (38592 bytes) Clearing the Brush - March 14, 2002
032102.JPG (34473 bytes) Initial Site is cleared
Shed distributing the sand.JPG (28530 bytes) Distributing the sand for the shed floor - May 23, 2002
Shed - Pouring Concrete.jpg (25564 bytes) June 25, 2002 Pouring the Concrete Floor for the Shed
Shed - Jim Laying the Electrical Conduit.jpg (31096 bytes) July 2, 2002 Jim installing the electrical conduit to the shed
Shed - Constructing the Walls.jpg (29512 bytes) July 1, 2002 Constructing the Shed Walls
Outside.JPG (17325 bytes) Outside View of the finished Shed that was completed by July 9.  It is 30' wide (east to west) and 40' long (north to south).  In the rear (south) 12' we have constructed an apartment that is similar to a large hotel room. The entrance to the apartment is through the door near the window on the south side.  The septic tank was installed on August 22.
AptEast.JPG (18686 bytes) Finally finished!! View to the east, just like the one above except the apartment is now finished.  We moved into the apartment on August 29, 2002