Clearing the Brush - March 14, 2002 |
 |
Initial Site is cleared |
 |
Distributing the sand for the shed floor - May 23, 2002 |
 |
June 25, 2002 Pouring the Concrete Floor for the Shed |
 |
July 2, 2002 Jim installing the electrical conduit to the shed |
 |
July 1, 2002 Constructing the Shed Walls |
 |
Outside View of the finished Shed that was completed by July 9. It
is 30' wide (east to west) and 40' long (north to south). In the rear (south) 12' we
have constructed an apartment that is similar to a large hotel room. The entrance to the
apartment is through the door near the window on the south side. The septic tank was
installed on August 22. |
 |
Finally finished!! View to the east, just like the one above except the
apartment is now finished. We moved into the apartment on August 29, 2002 |
| |
|
| |
|